{"id":164,"date":"2025-09-09T02:33:00","date_gmt":"2025-09-09T01:33:00","guid":{"rendered":"https:\/\/demo.casethemes.net\/consultio-business5\/?p=164"},"modified":"2025-10-27T10:01:28","modified_gmt":"2025-10-27T09:01:28","slug":"what-we-are-capable-to-beo-usually-discovered","status":"publish","type":"post","link":"https:\/\/skillsconsulting.ma\/index.php\/2025\/09\/09\/what-we-are-capable-to-beo-usually-discovered\/","title":{"rendered":"Agile vs Waterfall : Quelle M\u00e9thodologie de Gestion de Projet Choisir ?"},"content":{"rendered":"<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\">Le choix de la m\u00e9thodologie de gestion de projet est une d\u00e9cision structurante qui impacte directement la r\u00e9ussite de vos initiatives. Agile et Waterfall repr\u00e9sentent deux philosophies oppos\u00e9es, chacune avec ses forces et ses limites. Comment choisir l&#8217;approche la plus adapt\u00e9e \u00e0 votre contexte ?<\/p>\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\">Ce guide comparatif vous aide \u00e0 comprendre les diff\u00e9rences fondamentales entre ces deux m\u00e9thodologies et \u00e0 faire le bon choix selon vos projets.<\/p>\n<h2 id=\"introduction--comprendre-les-fondamentaux-des-deux\" class=\"mb-2 mt-4 font-display font-semimedium text-base first:mt-0 md:text-lg [hr+&amp;]:mt-4\">Introduction : Comprendre les Fondamentaux des Deux Approches<\/h2>\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\">Avant de comparer, d\u00e9finissons clairement chaque m\u00e9thodologie :<\/p>\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\"><strong>Waterfall (Cascade)<\/strong>\u00a0est une approche lin\u00e9aire et s\u00e9quentielle h\u00e9rit\u00e9e de l&#8217;ing\u00e9nierie traditionnelle. Le projet progresse phase par phase (exigences \u2192 conception \u2192 d\u00e9veloppement \u2192 tests \u2192 d\u00e9ploiement), chaque \u00e9tape devant \u00eatre compl\u00e9t\u00e9e avant de passer \u00e0 la suivante.<\/p>\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\"><strong>Agile<\/strong>\u00a0est une approche it\u00e9rative et adaptative qui d\u00e9coupe le projet en cycles courts (sprints de 1-4 semaines), chacun d\u00e9livrant un incr\u00e9ment fonctionnel du produit. L&#8217;\u00e9quipe s&#8217;adapte en continu aux retours et aux changements.<\/p>\n<h2 id=\"waterfall--lapproche-squentielle-classique\" class=\"mb-2 mt-4 font-display font-semimedium text-base first:mt-0 md:text-lg [hr+&amp;]:mt-4\">Waterfall : L&#8217;Approche S\u00e9quentielle Classique<\/h2>\n<h2 class=\"mb-2 mt-4 font-display font-semimedium text-base first:mt-0\">Principes fondamentaux<\/h2>\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\">La m\u00e9thodologie Waterfall, formalis\u00e9e par Winston Royce en 1970, repose sur une approche de planification compl\u00e8te en amont.<\/p>\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\"><strong>Les phases typiques :<\/strong><\/p>\n<ol>\n<li class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\"><strong>Collecte et analyse des exigences<\/strong>\u00a0: Documentation exhaustive de tous les besoins<\/li>\n<li class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\"><strong>Conception du syst\u00e8me<\/strong>\u00a0: Architecture d\u00e9taill\u00e9e et sp\u00e9cifications techniques<\/li>\n<li class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\"><strong>Impl\u00e9mentation<\/strong>\u00a0: D\u00e9veloppement selon les sp\u00e9cifications<\/li>\n<li class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\"><strong>Tests<\/strong>\u00a0: V\u00e9rification de la conformit\u00e9 aux exigences<\/li>\n<li class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\"><strong>D\u00e9ploiement<\/strong>\u00a0: Mise en production<\/li>\n<li class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\"><strong>Maintenance<\/strong>\u00a0: Corrections et \u00e9volutions mineures<\/li>\n<\/ol>\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\"><strong>Caract\u00e9ristiques cl\u00e9s :<\/strong><\/p>\n<ul>\n<li class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\">Planning d\u00e9taill\u00e9 et fix\u00e9 en d\u00e9but de projet<\/li>\n<li class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\">Documentation extensive \u00e0 chaque phase<\/li>\n<li class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\">Changements difficiles et co\u00fbteux une fois le projet lanc\u00e9<\/li>\n<li class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\">Livraison unique en fin de projet<\/li>\n<li class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\">R\u00f4les et responsabilit\u00e9s strictement d\u00e9finis<\/li>\n<\/ul>\n<h2 class=\"mb-2 mt-4 font-display font-semimedium text-base first:mt-0\">Quand utiliser Waterfall ?<\/h2>\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\"><strong>Projets avec exigences stables et bien d\u00e9finies<\/strong><\/p>\n<ul>\n<li class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\">Construction d&#8217;un b\u00e2timent<\/li>\n<li class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\">Projet de conformit\u00e9 r\u00e9glementaire<\/li>\n<li class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\">Migration syst\u00e8me avec p\u00e9rim\u00e8tre fig\u00e9<\/li>\n<\/ul>\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\"><strong>Secteurs r\u00e9glement\u00e9s<\/strong><\/p>\n<ul>\n<li class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\">A\u00e9ronautique, pharmaceutique, d\u00e9fense<\/li>\n<li class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\">O\u00f9 la documentation et la tra\u00e7abilit\u00e9 sont critiques<\/li>\n<\/ul>\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\"><strong>Environnements \u00e0 faible tol\u00e9rance au changement<\/strong><\/p>\n<ul>\n<li class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\">Syst\u00e8mes legacy n\u00e9cessitant une approche prudente<\/li>\n<li class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\">Projets avec d\u00e9pendances externes rigides<\/li>\n<\/ul>\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\"><strong>Projets avec \u00e9quipes distribu\u00e9es et peu d&#8217;interaction<\/strong><\/p>\n<ul>\n<li class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\">Sous-traitance avec cahier des charges contractuel<\/li>\n<li class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\">Peu de communication possible avec le client final<\/li>\n<\/ul>\n<h2 id=\"agile--lapproche-itrative-et-adaptative\" class=\"mb-2 mt-4 font-display font-semimedium text-base first:mt-0 md:text-lg [hr+&amp;]:mt-4\">Agile : L&#8217;Approche It\u00e9rative et Adaptative<\/h2>\n<h2 class=\"mb-2 mt-4 font-display font-semimedium text-base first:mt-0\">Principes fondamentaux<\/h2>\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\">Agile est n\u00e9 du Manifeste Agile de 2001 qui valorise :<\/p>\n<ul>\n<li class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\">Les individus et leurs interactions plus que les processus et outils<\/li>\n<li class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\">Des logiciels op\u00e9rationnels plus qu&#8217;une documentation exhaustive<\/li>\n<li class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\">La collaboration avec les clients plus que la n\u00e9gociation contractuelle<\/li>\n<li class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\">L&#8217;adaptation au changement plus que le suivi d&#8217;un plan<\/li>\n<\/ul>\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\"><strong>Le cycle Agile (Scrum) :<\/strong><\/p>\n<ol>\n<li class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\"><strong>Product Backlog<\/strong>\u00a0: Liste prioris\u00e9e des fonctionnalit\u00e9s d\u00e9sir\u00e9es<\/li>\n<li class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\"><strong>Sprint Planning<\/strong>\u00a0: S\u00e9lection du travail pour le sprint (1-4 semaines)<\/li>\n<li class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\"><strong>Daily Stand-up<\/strong>\u00a0: Point quotidien de 15 minutes<\/li>\n<li class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\"><strong>D\u00e9veloppement<\/strong>\u00a0: L&#8217;\u00e9quipe travaille sur les user stories s\u00e9lectionn\u00e9es<\/li>\n<li class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\"><strong>Sprint Review<\/strong>\u00a0: D\u00e9monstration du produit fonctionnel aux stakeholders<\/li>\n<li class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\"><strong>Sprint Retrospective<\/strong>\u00a0: L&#8217;\u00e9quipe r\u00e9fl\u00e9chit aux am\u00e9liorations possibles<\/li>\n<li class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\"><strong>Incr\u00e9ment de produit<\/strong>\u00a0: Livraison d&#8217;une version potentiellement utilisable<\/li>\n<\/ol>\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\"><strong>R\u00f4les cl\u00e9s :<\/strong><\/p>\n<ul>\n<li class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\"><strong>Product Owner<\/strong>\u00a0: D\u00e9finit les priorit\u00e9s, repr\u00e9sente le client<\/li>\n<li class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\"><strong>Scrum Master<\/strong>\u00a0: Facilite le processus, \u00e9limine les obstacles<\/li>\n<li class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\"><strong>\u00c9quipe de d\u00e9veloppement<\/strong>\u00a0: Auto-organis\u00e9e, cross-fonctionnelle<\/li>\n<\/ul>\n<h2 class=\"mb-2 mt-4 font-display font-semimedium text-base first:mt-0\">Quand utiliser Agile ?<\/h2>\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\"><strong>Projets innovants avec incertitudes<\/strong><\/p>\n<ul>\n<li class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\">Nouveau produit sans r\u00e9f\u00e9rence march\u00e9 claire<\/li>\n<li class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\">Exploration d&#8217;une nouvelle technologie<\/li>\n<li class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\">Startup en phase de product-market fit<\/li>\n<\/ul>\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\"><strong>Environnements changeants<\/strong><\/p>\n<ul>\n<li class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\">March\u00e9 volatile n\u00e9cessitant des ajustements fr\u00e9quents<\/li>\n<li class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\">Exigences \u00e9volutives au fil du projet<\/li>\n<li class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\">Feedback utilisateur continu souhait\u00e9<\/li>\n<\/ul>\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\"><strong>Projets n\u00e9cessitant du time-to-market rapide<\/strong><\/p>\n<ul>\n<li class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\">Livraison progressive de valeur<\/li>\n<li class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\">Premiers utilisateurs d\u00e8s les premiers sprints<\/li>\n<li class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\">Apprentissage it\u00e9ratif<\/li>\n<\/ul>\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\"><strong>\u00c9quipes colocalis\u00e9es et collaboratives<\/strong><\/p>\n<ul>\n<li class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\">Communication quotidienne facile<\/li>\n<li class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\">Forte implication du client<\/li>\n<li class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\">Culture d&#8217;autonomie et de responsabilisation<\/li>\n<\/ul>\n<h2 id=\"tableau-comparatif--10-diffrences-cls\" class=\"mb-2 mt-4 font-display font-semimedium text-base first:mt-0 md:text-lg [hr+&amp;]:mt-4\">Tableau Comparatif : 10 Diff\u00e9rences Cl\u00e9s<\/h2>\n<div class=\"group relative\">\n<div class=\"w-full overflow-x-auto md:max-w-[90vw] border-subtlest ring-subtlest divide-subtlest bg-transparent\">\n<table class=\"border-subtler my-[1em] w-full table-auto border-separate border-spacing-0 border-l border-t\">\n<thead class=\"bg-subtler\">\n<tr>\n<th class=\"border-subtler p-sm break-normal border-b border-r text-left align-top\">Crit\u00e8re<\/th>\n<th class=\"border-subtler p-sm break-normal border-b border-r text-left align-top\">Waterfall<\/th>\n<th class=\"border-subtler p-sm break-normal border-b border-r text-left align-top\">Agile<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td class=\"px-sm border-subtler min-w-[48px] break-normal border-b border-r\"><strong>Approche<\/strong><\/td>\n<td class=\"px-sm border-subtler min-w-[48px] break-normal border-b border-r\">Lin\u00e9aire et s\u00e9quentielle<\/td>\n<td class=\"px-sm border-subtler min-w-[48px] break-normal border-b border-r\">It\u00e9rative et incr\u00e9mentale<\/td>\n<\/tr>\n<tr>\n<td class=\"px-sm border-subtler min-w-[48px] break-normal border-b border-r\"><strong>Flexibilit\u00e9<\/strong><\/td>\n<td class=\"px-sm border-subtler min-w-[48px] break-normal border-b border-r\">Rigide, changements co\u00fbteux<\/td>\n<td class=\"px-sm border-subtler min-w-[48px] break-normal border-b border-r\">Flexible, s&#8217;adapte au changement<\/td>\n<\/tr>\n<tr>\n<td class=\"px-sm border-subtler min-w-[48px] break-normal border-b border-r\"><strong>Planning<\/strong><\/td>\n<td class=\"px-sm border-subtler min-w-[48px] break-normal border-b border-r\">Complet en d\u00e9but de projet<\/td>\n<td class=\"px-sm border-subtler min-w-[48px] break-normal border-b border-r\">Continu, adaptatif<\/td>\n<\/tr>\n<tr>\n<td class=\"px-sm border-subtler min-w-[48px] break-normal border-b border-r\"><strong>P\u00e9rim\u00e8tre<\/strong><\/td>\n<td class=\"px-sm border-subtler min-w-[48px] break-normal border-b border-r\">Fixe d\u00e8s le d\u00e9but<\/td>\n<td class=\"px-sm border-subtler min-w-[48px] break-normal border-b border-r\">\u00c9volutif selon les priorit\u00e9s<\/td>\n<\/tr>\n<tr>\n<td class=\"px-sm border-subtler min-w-[48px] break-normal border-b border-r\"><strong>Livraisons<\/strong><\/td>\n<td class=\"px-sm border-subtler min-w-[48px] break-normal border-b border-r\">Unique en fin de projet<\/td>\n<td class=\"px-sm border-subtler min-w-[48px] break-normal border-b border-r\">Fr\u00e9quentes (chaque sprint)<\/td>\n<\/tr>\n<tr>\n<td class=\"px-sm border-subtler min-w-[48px] break-normal border-b border-r\"><strong>Documentation<\/strong><\/td>\n<td class=\"px-sm border-subtler min-w-[48px] break-normal border-b border-r\">Extensive et d\u00e9taill\u00e9e<\/td>\n<td class=\"px-sm border-subtler min-w-[48px] break-normal border-b border-r\">Minimale, focus sur le produit<\/td>\n<\/tr>\n<tr>\n<td class=\"px-sm border-subtler min-w-[48px] break-normal border-b border-r\"><strong>R\u00f4les<\/strong><\/td>\n<td class=\"px-sm border-subtler min-w-[48px] break-normal border-b border-r\">Strictement d\u00e9finis<\/td>\n<td class=\"px-sm border-subtler min-w-[48px] break-normal border-b border-r\">\u00c9quipes auto-organis\u00e9es<\/td>\n<\/tr>\n<tr>\n<td class=\"px-sm border-subtler min-w-[48px] break-normal border-b border-r\"><strong>Implication client<\/strong><\/td>\n<td class=\"px-sm border-subtler min-w-[48px] break-normal border-b border-r\">D\u00e9but et fin principalement<\/td>\n<td class=\"px-sm border-subtler min-w-[48px] break-normal border-b border-r\">Continue tout au long<\/td>\n<\/tr>\n<tr>\n<td class=\"px-sm border-subtler min-w-[48px] break-normal border-b border-r\"><strong>Tests<\/strong><\/td>\n<td class=\"px-sm border-subtler min-w-[48px] break-normal border-b border-r\">Phase d\u00e9di\u00e9e en fin de cycle<\/td>\n<td class=\"px-sm border-subtler min-w-[48px] break-normal border-b border-r\">Continus \u00e0 chaque it\u00e9ration<\/td>\n<\/tr>\n<tr>\n<td class=\"px-sm border-subtler min-w-[48px] break-normal border-b border-r\"><strong>Gestion des risques<\/strong><\/td>\n<td class=\"px-sm border-subtler min-w-[48px] break-normal border-b border-r\">Identifi\u00e9s en amont<\/td>\n<td class=\"px-sm border-subtler min-w-[48px] break-normal border-b border-r\">D\u00e9couverts et trait\u00e9s it\u00e9rativement<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<\/div>\n<h2 id=\"les-avantages-et-inconvnients-de-chaque-mthodologi\" class=\"mb-2 mt-4 font-display font-semimedium text-base first:mt-0 md:text-lg [hr+&amp;]:mt-4\">Les Avantages et Inconv\u00e9nients de Chaque M\u00e9thodologie<\/h2>\n<h2 class=\"mb-2 mt-4 font-display font-semimedium text-base first:mt-0\">Avantages de Waterfall<\/h2>\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\">\u2705\u00a0<strong>Pr\u00e9visibilit\u00e9<\/strong>\u00a0: Budget, d\u00e9lais et p\u00e9rim\u00e8tre clairs d\u00e8s le d\u00e9but<br \/>\u2705\u00a0<strong>Documentation compl\u00e8te<\/strong>\u00a0: Facilite la maintenance et les transferts<br \/>\u2705\u00a0<strong>Structure claire<\/strong>\u00a0: Jalons et livrables bien d\u00e9finis<br \/>\u2705\u00a0<strong>Adapt\u00e9 aux contrats fixes<\/strong>\u00a0: Prix forfaitaire justifiable<br \/>\u2705\u00a0<strong>Moins de coordination n\u00e9cessaire<\/strong>\u00a0: Phases s\u00e9quentielles<\/p>\n<h2 class=\"mb-2 mt-4 font-display font-semimedium text-base first:mt-0\">Inconv\u00e9nients de Waterfall<\/h2>\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\">\u274c\u00a0<strong>Rigidit\u00e9<\/strong>\u00a0: Difficile de changer de direction<br \/>\u274c\u00a0<strong>Risques tardifs<\/strong>\u00a0: Probl\u00e8mes d\u00e9couverts seulement en phase de test<br \/>\u274c\u00a0<strong>Long d\u00e9lai avant valeur<\/strong>\u00a0: Aucun livrable utilisable avant la fin<br \/>\u274c\u00a0<strong>Gaspillage potentiel<\/strong>\u00a0: Fonctionnalit\u00e9s inutiles d\u00e9velopp\u00e9es<br \/>\u274c\u00a0<strong>Client distant<\/strong>\u00a0: Peu impliqu\u00e9 pendant l&#8217;ex\u00e9cution<\/p>\n<h2 class=\"mb-2 mt-4 font-display font-semimedium text-base first:mt-0\">Avantages d&#8217;Agile<\/h2>\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\">\u2705\u00a0<strong>Adaptabilit\u00e9<\/strong>\u00a0: R\u00e9ponse rapide aux changements<br \/>\u2705\u00a0<strong>Livraison rapide de valeur<\/strong>\u00a0: Produit utilisable d\u00e8s les premiers sprints<br \/>\u2705\u00a0<strong>Satisfaction client<\/strong>\u00a0: Implication continue, alignement garanti<br \/>\u2705\u00a0<strong>Qualit\u00e9<\/strong>\u00a0: Tests continus, d\u00e9tection pr\u00e9coce des probl\u00e8mes<br \/>\u2705\u00a0<strong>Motivation d&#8217;\u00e9quipe<\/strong>\u00a0: Autonomie, ownership, r\u00e9sultats visibles<\/p>\n<h2 class=\"mb-2 mt-4 font-display font-semimedium text-base first:mt-0\">Inconv\u00e9nients d&#8217;Agile<\/h2>\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:pb-2\">\u274c\u00a0<strong>Pr\u00e9visibilit\u00e9 limit\u00e9e<\/strong>\u00a0: Difficile d&#8217;estimer budget et d\u00e9lais finaux<br \/>\u274c\u00a0<strong>N\u00e9cessite implication forte<\/strong>\u00a0: Client devant \u00eatre tr\u00e8s disponible<br \/>\u274c\u00a0<strong>Peut manquer de discipline<\/strong>\u00a0: Risque de scope creep si mal g\u00e9r\u00e9<br \/>\u274c\u00a0<strong>Documentation l\u00e9g\u00e8re<\/strong>\u00a0: Peut poser probl\u00e8me pour la maintenance<br \/>\u274c\u00a0<strong>Culture exigeante<\/strong>\u00a0: N\u00e9cessite maturit\u00e9 et confiance de l&#8217;\u00e9quipe<\/p>\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>At vero eos et accusamus et iustoodio digni goikussimos ducimus qui blanp ditiis praesum voluum. <\/p>\n","protected":false},"author":1,"featured_media":10056,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[93,79,78,94],"class_list":["post-164","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-gestion","tag-agile","tag-gestion-de-projet","tag-project-management-office","tag-waterfall"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Agile vs Waterfall : Quelle M\u00e9thodologie de Gestion de Projet Choisir ? - Skills Campus - Audit &amp; Consulting<\/title>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Agile vs Waterfall : Quelle M\u00e9thodologie de Gestion de Projet Choisir ? - Skills Campus - Audit &amp; Consulting\" \/>\n<meta property=\"og:description\" content=\"At vero eos et accusamus et iustoodio digni goikussimos ducimus qui blanp ditiis praesum voluum.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skillsconsulting.ma\/index.php\/2025\/09\/09\/what-we-are-capable-to-beo-usually-discovered\/\" \/>\n<meta property=\"og:site_name\" content=\"Skills Campus - Audit &amp; Consulting\" \/>\n<meta property=\"article:published_time\" content=\"2025-09-09T01:33:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-10-27T09:01:28+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skillsconsulting.ma\/wp-content\/uploads\/2025\/04\/Agile-vs-Waterfall.png\" \/>\n\t<meta property=\"og:image:width\" content=\"760\" \/>\n\t<meta property=\"og:image:height\" content=\"555\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"admin_sg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin_sg\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skillsconsulting.ma\\\/index.php\\\/2025\\\/09\\\/09\\\/what-we-are-capable-to-beo-usually-discovered\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skillsconsulting.ma\\\/index.php\\\/2025\\\/09\\\/09\\\/what-we-are-capable-to-beo-usually-discovered\\\/\"},\"author\":{\"name\":\"admin_sg\",\"@id\":\"https:\\\/\\\/skillsconsulting.ma\\\/#\\\/schema\\\/person\\\/15220e164f8138cd42de9dc435861058\"},\"headline\":\"Agile vs Waterfall : Quelle M\u00e9thodologie de Gestion de Projet Choisir ?\",\"datePublished\":\"2025-09-09T01:33:00+00:00\",\"dateModified\":\"2025-10-27T09:01:28+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skillsconsulting.ma\\\/index.php\\\/2025\\\/09\\\/09\\\/what-we-are-capable-to-beo-usually-discovered\\\/\"},\"wordCount\":974,\"image\":{\"@id\":\"https:\\\/\\\/skillsconsulting.ma\\\/index.php\\\/2025\\\/09\\\/09\\\/what-we-are-capable-to-beo-usually-discovered\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skillsconsulting.ma\\\/wp-content\\\/uploads\\\/2025\\\/04\\\/Agile-vs-Waterfall.png\",\"keywords\":[\"agile\",\"gestion de projet\",\"Project Management Office\",\"waterfall\"],\"articleSection\":[\"Gestion de Projets\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skillsconsulting.ma\\\/index.php\\\/2025\\\/09\\\/09\\\/what-we-are-capable-to-beo-usually-discovered\\\/\",\"url\":\"https:\\\/\\\/skillsconsulting.ma\\\/index.php\\\/2025\\\/09\\\/09\\\/what-we-are-capable-to-beo-usually-discovered\\\/\",\"name\":\"Agile vs Waterfall : Quelle M\u00e9thodologie de Gestion de Projet Choisir ? - Skills Campus - Audit &amp; Consulting\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skillsconsulting.ma\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skillsconsulting.ma\\\/index.php\\\/2025\\\/09\\\/09\\\/what-we-are-capable-to-beo-usually-discovered\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skillsconsulting.ma\\\/index.php\\\/2025\\\/09\\\/09\\\/what-we-are-capable-to-beo-usually-discovered\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skillsconsulting.ma\\\/wp-content\\\/uploads\\\/2025\\\/04\\\/Agile-vs-Waterfall.png\",\"datePublished\":\"2025-09-09T01:33:00+00:00\",\"dateModified\":\"2025-10-27T09:01:28+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/skillsconsulting.ma\\\/#\\\/schema\\\/person\\\/15220e164f8138cd42de9dc435861058\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skillsconsulting.ma\\\/index.php\\\/2025\\\/09\\\/09\\\/what-we-are-capable-to-beo-usually-discovered\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skillsconsulting.ma\\\/index.php\\\/2025\\\/09\\\/09\\\/what-we-are-capable-to-beo-usually-discovered\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/skillsconsulting.ma\\\/index.php\\\/2025\\\/09\\\/09\\\/what-we-are-capable-to-beo-usually-discovered\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skillsconsulting.ma\\\/wp-content\\\/uploads\\\/2025\\\/04\\\/Agile-vs-Waterfall.png\",\"contentUrl\":\"https:\\\/\\\/skillsconsulting.ma\\\/wp-content\\\/uploads\\\/2025\\\/04\\\/Agile-vs-Waterfall.png\",\"width\":760,\"height\":555},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skillsconsulting.ma\\\/index.php\\\/2025\\\/09\\\/09\\\/what-we-are-capable-to-beo-usually-discovered\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skillsconsulting.ma\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Agile vs Waterfall : Quelle M\u00e9thodologie de Gestion de Projet Choisir ?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skillsconsulting.ma\\\/#website\",\"url\":\"https:\\\/\\\/skillsconsulting.ma\\\/\",\"name\":\"Skills Campus - Audit &amp; Consulting\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skillsconsulting.ma\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skillsconsulting.ma\\\/#\\\/schema\\\/person\\\/15220e164f8138cd42de9dc435861058\",\"name\":\"admin_sg\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c1f2000689ea005d888023fb0ddf5e066062cee6b4405a1f1b5bc546b41e40bc?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c1f2000689ea005d888023fb0ddf5e066062cee6b4405a1f1b5bc546b41e40bc?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c1f2000689ea005d888023fb0ddf5e066062cee6b4405a1f1b5bc546b41e40bc?s=96&d=mm&r=g\",\"caption\":\"admin_sg\"},\"sameAs\":[\"https:\\\/\\\/skillsconsulting.ma\\\/\"],\"url\":\"https:\\\/\\\/skillsconsulting.ma\\\/index.php\\\/author\\\/admin_sg\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Agile vs Waterfall : Quelle M\u00e9thodologie de Gestion de Projet Choisir ? - Skills Campus - Audit &amp; Consulting","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"en_US","og_type":"article","og_title":"Agile vs Waterfall : Quelle M\u00e9thodologie de Gestion de Projet Choisir ? - Skills Campus - Audit &amp; Consulting","og_description":"At vero eos et accusamus et iustoodio digni goikussimos ducimus qui blanp ditiis praesum voluum.","og_url":"https:\/\/skillsconsulting.ma\/index.php\/2025\/09\/09\/what-we-are-capable-to-beo-usually-discovered\/","og_site_name":"Skills Campus - Audit &amp; Consulting","article_published_time":"2025-09-09T01:33:00+00:00","article_modified_time":"2025-10-27T09:01:28+00:00","og_image":[{"width":760,"height":555,"url":"https:\/\/skillsconsulting.ma\/wp-content\/uploads\/2025\/04\/Agile-vs-Waterfall.png","type":"image\/png"}],"author":"admin_sg","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin_sg","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skillsconsulting.ma\/index.php\/2025\/09\/09\/what-we-are-capable-to-beo-usually-discovered\/#article","isPartOf":{"@id":"https:\/\/skillsconsulting.ma\/index.php\/2025\/09\/09\/what-we-are-capable-to-beo-usually-discovered\/"},"author":{"name":"admin_sg","@id":"https:\/\/skillsconsulting.ma\/#\/schema\/person\/15220e164f8138cd42de9dc435861058"},"headline":"Agile vs Waterfall : Quelle M\u00e9thodologie de Gestion de Projet Choisir ?","datePublished":"2025-09-09T01:33:00+00:00","dateModified":"2025-10-27T09:01:28+00:00","mainEntityOfPage":{"@id":"https:\/\/skillsconsulting.ma\/index.php\/2025\/09\/09\/what-we-are-capable-to-beo-usually-discovered\/"},"wordCount":974,"image":{"@id":"https:\/\/skillsconsulting.ma\/index.php\/2025\/09\/09\/what-we-are-capable-to-beo-usually-discovered\/#primaryimage"},"thumbnailUrl":"https:\/\/skillsconsulting.ma\/wp-content\/uploads\/2025\/04\/Agile-vs-Waterfall.png","keywords":["agile","gestion de projet","Project Management Office","waterfall"],"articleSection":["Gestion de Projets"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/skillsconsulting.ma\/index.php\/2025\/09\/09\/what-we-are-capable-to-beo-usually-discovered\/","url":"https:\/\/skillsconsulting.ma\/index.php\/2025\/09\/09\/what-we-are-capable-to-beo-usually-discovered\/","name":"Agile vs Waterfall : Quelle M\u00e9thodologie de Gestion de Projet Choisir ? - Skills Campus - Audit &amp; Consulting","isPartOf":{"@id":"https:\/\/skillsconsulting.ma\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skillsconsulting.ma\/index.php\/2025\/09\/09\/what-we-are-capable-to-beo-usually-discovered\/#primaryimage"},"image":{"@id":"https:\/\/skillsconsulting.ma\/index.php\/2025\/09\/09\/what-we-are-capable-to-beo-usually-discovered\/#primaryimage"},"thumbnailUrl":"https:\/\/skillsconsulting.ma\/wp-content\/uploads\/2025\/04\/Agile-vs-Waterfall.png","datePublished":"2025-09-09T01:33:00+00:00","dateModified":"2025-10-27T09:01:28+00:00","author":{"@id":"https:\/\/skillsconsulting.ma\/#\/schema\/person\/15220e164f8138cd42de9dc435861058"},"breadcrumb":{"@id":"https:\/\/skillsconsulting.ma\/index.php\/2025\/09\/09\/what-we-are-capable-to-beo-usually-discovered\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skillsconsulting.ma\/index.php\/2025\/09\/09\/what-we-are-capable-to-beo-usually-discovered\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/skillsconsulting.ma\/index.php\/2025\/09\/09\/what-we-are-capable-to-beo-usually-discovered\/#primaryimage","url":"https:\/\/skillsconsulting.ma\/wp-content\/uploads\/2025\/04\/Agile-vs-Waterfall.png","contentUrl":"https:\/\/skillsconsulting.ma\/wp-content\/uploads\/2025\/04\/Agile-vs-Waterfall.png","width":760,"height":555},{"@type":"BreadcrumbList","@id":"https:\/\/skillsconsulting.ma\/index.php\/2025\/09\/09\/what-we-are-capable-to-beo-usually-discovered\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skillsconsulting.ma\/"},{"@type":"ListItem","position":2,"name":"Agile vs Waterfall : Quelle M\u00e9thodologie de Gestion de Projet Choisir ?"}]},{"@type":"WebSite","@id":"https:\/\/skillsconsulting.ma\/#website","url":"https:\/\/skillsconsulting.ma\/","name":"Skills Campus - Audit &amp; Consulting","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skillsconsulting.ma\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/skillsconsulting.ma\/#\/schema\/person\/15220e164f8138cd42de9dc435861058","name":"admin_sg","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/c1f2000689ea005d888023fb0ddf5e066062cee6b4405a1f1b5bc546b41e40bc?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/c1f2000689ea005d888023fb0ddf5e066062cee6b4405a1f1b5bc546b41e40bc?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c1f2000689ea005d888023fb0ddf5e066062cee6b4405a1f1b5bc546b41e40bc?s=96&d=mm&r=g","caption":"admin_sg"},"sameAs":["https:\/\/skillsconsulting.ma\/"],"url":"https:\/\/skillsconsulting.ma\/index.php\/author\/admin_sg\/"}]}},"_links":{"self":[{"href":"https:\/\/skillsconsulting.ma\/index.php\/wp-json\/wp\/v2\/posts\/164","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skillsconsulting.ma\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skillsconsulting.ma\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skillsconsulting.ma\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/skillsconsulting.ma\/index.php\/wp-json\/wp\/v2\/comments?post=164"}],"version-history":[{"count":1,"href":"https:\/\/skillsconsulting.ma\/index.php\/wp-json\/wp\/v2\/posts\/164\/revisions"}],"predecessor-version":[{"id":10152,"href":"https:\/\/skillsconsulting.ma\/index.php\/wp-json\/wp\/v2\/posts\/164\/revisions\/10152"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skillsconsulting.ma\/index.php\/wp-json\/wp\/v2\/media\/10056"}],"wp:attachment":[{"href":"https:\/\/skillsconsulting.ma\/index.php\/wp-json\/wp\/v2\/media?parent=164"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skillsconsulting.ma\/index.php\/wp-json\/wp\/v2\/categories?post=164"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skillsconsulting.ma\/index.php\/wp-json\/wp\/v2\/tags?post=164"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}